TORONTO, April 04, 2022 (GLOBE NEWSWIRE) — Marathon Gold Corporation (“Marathon” or the “Company”; TSX: MOZ) is pleased to report the latest drill assay results from the Valentine Gold Project in central Newfoundland (the “Project”). The latest drill results represent fire assay data from twenty diamond drill holes completed as part of the 2021 in-fill drill campaign at the 1.5 kilometre long Berry Deposit. Highlights include:
- VL-21-1150 intersected 7.17 g/t Au over 21 metres including 84.40 g/t Au over 1 metre and including 19.13 g/t Au over 1 metre and including 12.61 g/t Au over 1 metre, and 50.17 g/t Au over 1 metre;
- VL-21-1142 intersected 5.25 g/t Au over 17 metres including 32.05 g/t Au over 2 metres, and 0.81 g/t Au over 23 metres;
- VL-21-1155 intersected 3.10 g/t Au over 19.3 metres including 13.96 g/t Au over 3 metres, and 4.83 g/t Au over 8 metres including 15.29 g/t Au over 1 metre, and 8.27 g//t Au over 3 metres including 22.49 g/t Au over 1 metre;
- VL-21-1156 intersected 19.28 g/t Au over 3 metres including 54.07 g/t Au over 1 metre, and 7.99 g/t Au over 5 metres including 31.64 g/t Au over 1 metre, and 8.17 g/t Au over 3 metres including 17.38 g/t Au over 1 metre;
- VL-21-1159 intersected 1.42 g/t Au over 20 metres, and 11.75 g/t Au over 3 metres including 33.10 g/t Au over 1 metre, and 1.13 g/t Au over 16 metres; and
- VL-21-1145 intersected 2.37 g/t Au over 24 metres including 28.89 g/t Au over 1 metre.
All quoted intersections comprise uncut gold assays in core lengths. All significant assay intervals are reported in Table 1.
Matt Manson, President and CEO, commented: “With these latest 20 exploration holes from Berry we are continuing our practice of releasing drill results in whole-hole batches as they come to us from the assay lab. One more batch of 2021 holes remains outstanding, after which we will have released a total of approximately 100,000 metres of Berry drilling. These will be the data utilized in our next mineral resource update. Of note in today’s batch, high grade intercepts show SW-dipping structural continuity over multiple holes below the current conceptual pit shell on Section 14120E (Figures 4 and 5). So far in 2022, 9,810 metres of exploration drilling has been completed at the Berry Deposit and 2,720 metres at the Victory Deposit. Drilling is expected to resume shortly after our annual spring shutdown during March and April.”
Gold Mineralization at the Valentine Gold Project
Gold mineralization at the Valentine Gold Project is contained in Quartz-Tourmaline-Pyrite-Gold (“QTP-Au”) veins developed within granitoid rocks on the hanging wall, or northwest, side of the Valentine Lake Shear Zone (“VLSZ”; Figure 1). Up to four orientations of veins have been measured, with shallowly southwest dipping “Set 1” QTP-Au veins observed to be dominant in both abundance and gold content. At the Leprechaun, Marathon and Berry Deposits, Set 1 QTP-Au veins form densely stacked corridors of mineralization referred to as “Main Zones”. The extent and scale of these mineralised corridors appear related to the size and frequency of sheared mafic dykes which extend northeast-southwest within the granitoid rocks, parallel to the shear zone.
Figure 1: Location Map, Valentine Gold Project
https://www.globenewswire.com/NewsRoom/AttachmentNg/563a5d04-1b4c-468e-a503-7409f9420023
Berry Deposit Drill Results
The results released today are derived from twenty drill holes located between sections 13600E and 14180E. Fourteen of these drill holes are located within the western conceptual pit utilized in the April 2021 Berry Mineral Resource Estimate. Eleven holes (VL-21-1142, 1145, 1148, 1149, 1150, 1151, 1152, 1153, 1156, 1157 and 1159) were oriented steeply to the northwest testing for Main Zone-type stacked QTP-Au mineralization in “Set 1” vein orientations while three holes (VL-21-1154, 1155 and 1158) were oriented more shallowly towards the SE in order to better define the thickness of the mineralized zones and the location of the VLSZ.
Fifteen of the twenty drill holes returned “significant” drill intercepts of greater than 0.7 g/t Au (Table 1). Sixteen holes returned additional intercepts with gold grades above the 0.3 g/t Au cut-off used in the April 2021 Berry Mineral Resource estimate.
Six of the drill holes released today (VL-21-1140, 1141, 1143, 1144, 1146 and 1147) were part of a reconnaissance step-out program over an approximately 750 metre distance from the northwestern margin of the currently defined Berry Mineral Resource estimate towards the historical “Scott Showing” further to the northwest. The Scott Showing comprises an outcrop of extensive QTP veining, albeit with minimal gold content. Only one of these six holes returned an a “significant” drill intercept of greater than 0.7 g/t Au (VL-21-1146).
Figure 2: Location of Berry Deposit Exploration Drill Hole Collars VL-21-1140 to VL-21-1159
https://www.globenewswire.com/NewsRoom/AttachmentNg/0fcace5e-c0d1-4d95-8fbb-fe53e3dd6d38
Figure 3: Long Section of the Berry Deposit (View NW) Incorporating all Drilling up to and Including VL-21-1159, Representing 93,570 metres, and Assays Above 0.3 g/t Au.
https://www.globenewswire.com/NewsRoom/AttachmentNg/5204898c-246d-4a83-a936-94b9502ca74f
The 2021 infill drill program at the Berry Deposit has been conducted with the objective of achieving an approximate 25 metre drill spacing over Berry’s Main Zone of dense mineralisation and extending drill coverage into the Berry hanging-wall to the northwest and down to a vertical depth of 300 metres. Figure 3 illustrates the extent to which this has been achieved, in long section, after approximately 93,570 metres of assay results.
Table 1: Significant Assay Intervals from Drill Hole Collars VL-21-1140 to VL-21-1159, Berry Deposit, Valentine Gold Project
DDH | Section | Az | Dip | From | To | Core Length (m) |
True Thickness (m) |
Gold g/t | Gold g/t (cut) |
VL-21-1142 | 13660E | 347 | -76 | 65 | 66 | 1 | 0.90 | 0.86 | |
88 | 105 | 17 | 15.30 | 5.25 | 3.99 | ||||
Including | 88 | 90 | 2 | 1.80 | 32.05 | 21.36 | |||
150 | 173 | 23 | 20.70 | 0.81 | |||||
181 | 182 | 1 | 0.90 | 1.10 | |||||
193 | 194 | 1 | 0.90 | 0.94 | |||||
318 | 319 | 1 | 0.90 | 1.22 | |||||
333 | 335 | 2 | 1.80 | 0.82 | |||||
VL-21-1145 | 13660E | 349 | -76 | 37 | 38 | 1 | 0.90 | 1.27 | |
138 | 139 | 1 | 0.90 | 1.33 | |||||
150 | 155 | 5 | 4.50 | 1.48 | |||||
169 | 173 | 4 | 3.60 | 0.96 | |||||
186 | 210 | 24 | 21.60 | 2.37 | |||||
Including | 191 | 192 | 1 | 0.90 | 28.69 | ||||
236 | 237 | 1 | 0.90 | 0.74 | |||||
262 | 263 | 1 | 0.90 | 1.46 | |||||
292 | 293 | 1 | 0.90 | 1.19 | |||||
295 | 296 | 1 | 0.90 | 0.81 | |||||
300 | 302 | 2 | 1.80 | 3.34 | |||||
VL-21-1146 | 13600E | 344 | -59 | 47 | 49 | 2 | 1.60 | 9.47 | |
VL-21-1148 | 14100E | 344 | -72 | 47 | 49 | 2 | 1.80 | 1.11 | |
55 | 56 | 1 | 0.90 | 1.32 | |||||
62 | 63 | 1 | 0.90 | 0.98 | |||||
72 | 77 | 5 | 4.50 | 1.39 | |||||
121 | 122 | 1 | 0.90 | 0.82 | |||||
124 | 125 | 1 | 0.90 | 0.88 | |||||
128 | 131 | 3 | 2.70 | 1.52 | |||||
173 | 174 | 1 | 0.90 | 2.20 | |||||
177 | 178 | 1 | 0.90 | 1.54 | |||||
181 | 183 | 2 | 1.80 | 0.93 | |||||
VL-21-1149 | 13640E | 345 | -76 | 109 | 114 | 5 | 4.50 | 1.11 | |
120 | 121 | 1 | 0.90 | 5.56 | |||||
127 | 152 | 25 | 22.50 | 1.58 | |||||
Including | 144 | 145 | 1 | 0.90 | 15.16 | ||||
160 | 161 | 1 | 0.90 | 10.17 | |||||
164 | 168 | 4 | 3.60 | 0.73 | |||||
200 | 202 | 2 | 1.80 | 14.78 | |||||
Including | 201 | 202 | 1 | 0.90 | 28.18 | ||||
305 | 306 | 1 | 0.90 | 1.58 | |||||
VL-21-1150 | 14120E | 342 | -75 | 70 | 71 | 1 | 0.90 | 50.17 | 30 |
87 | 90 | 3 | 2.70 | 2.17 | |||||
109 | 110 | 1 | 0.90 | 9.55 | |||||
122 | 123 | 1 | 0.90 | 8.42 | |||||
130 | 131 | 1 | 0.90 | 1.45 | |||||
143 | 147 | 4 | 3.60 | 2.56 | |||||
162 | 183 | 21 | 18.90 | 7.17 | 4.58 | ||||
Including | 164 | 165 | 1 | 0.90 | 19.13 | ||||
176 | 177 | 1 | 0.90 | 84.40 | 30 | ||||
Including | 182 | 183 | 1 | 0.90 | 12.61 | ||||
187 | 188 | 1 | 0.90 | 0.86 | |||||
192 | 193 | 1 | 0.90 | 0.96 | |||||
VL-21-1151 | 13640E | 346 | -77 | 149 | 151 | 2 | 1.80 | 1.66 | |
155 | 156 | 1 | 0.90 | 1.53 | |||||
160 | 161 | 1 | 0.90 | 1.00 | |||||
178 | 180 | 2 | 1.80 | 0.95 | |||||
203 | 204 | 1 | 0.90 | 0.93 | |||||
212 | 213 | 1 | 0.90 | 1.04 | |||||
VL-21-1152 | 14160E | 340 | -75 | 62 | 63 | 1 | 0.90 | 1.70 | |
101 | 104 | 3 | 2.70 | 2.86 | |||||
127 | 128 | 1 | 0.90 | 1.18 | |||||
147 | 148 | 1 | 0.90 | 0.71 | |||||
178 | 197 | 19 | 17.10 | 2.62 | 2.37 | ||||
Including | 180 | 181 | 1 | 0.90 | 34.75 | 30 | |||
VL-21-1153 | 13620E | 344 | -78 | 50 | 51 | 1 | 0.90 | 1.31 | |
140 | 144 | 4 | 3.60 | 3.62 | |||||
201 | 203 | 2 | 1.80 | 1.37 | |||||
222 | 224 | 2 | 1.80 | 1.14 | |||||
298 | 299 | 1 | 0.90 | 3.73 | |||||
303 | 306 | 3 | 2.70 | 0.83 | |||||
VL-21-1154 | 14150E | 164 | -70 | 98 | 99 | 1 | 0.85 | 3.29 | |
103 | 104 | 1 | 0.85 | 23.72 | |||||
116 | 126 | 10 | 8.50 | 3.83 | |||||
Including | 123 | 125 | 2 | 1.70 | 14.26 | ||||
156 | 171 | 15 | 12.75 | 1.35 | |||||
197 | 198 | 1 | 0.85 | 0.82 | |||||
200 | 201 | 1 | 0.85 | 1.65 | |||||
206 | 208 | 2 | 1.70 | 1.05 | |||||
217 | 220 | 3 | 2.55 | 0.76 | |||||
VL-21-1155 | 13550E | 162 | -72 | 3.7 | 23 | 19.3 | 17.37 | 3.10 | |
Including | 11 | 14 | 3 | 2.70 | 13.96 | ||||
29 | 37 | 8 | 7.20 | 4.83 | |||||
Including | 33 | 34 | 1 | 0.90 | 15.29 | ||||
74 | 75 | 1 | 0.90 | 5.48 | |||||
78 | 81 | 3 | 2.70 | 8.27 | |||||
Including | 79 | 80 | 1 | 0.90 | 22.49 | ||||
233 | 234 | 1 | 0.90 | 0.70 | |||||
272 | 273 | 1 | 0.90 | 3.04 | |||||
275 | 276 | 1 | 0.90 | 9.45 | |||||
314 | 315 | 1 | 0.90 | 28.06 | |||||
VL-21-1156 | 14140E | 346 | -74 | 56 | 57 | 1 | 0.90 | 0.88 | |
63 | 64 | 1 | 0.90 | 3.77 | |||||
70 | 74 | 4 | 3.60 | 1.97 | |||||
89 | 94 | 5 | 4.50 | 0.91 | |||||
109 | 110 | 1 | 0.90 | 1.14 | |||||
113 | 114 | 1 | 0.90 | 0.78 | |||||
121 | 126 | 5 | 4.50 | 7.99 | 7.66 | ||||
Including | 124 | 125 | 1 | 0.90 | 31.64 | 30 | |||
136 | 139 | 3 | 2.70 | 8.17 | |||||
Including | 137 | 138 | 1 | 0.90 | 17.38 | ||||
158 | 159 | 1 | 0.90 | 5.03 | |||||
163 | 165 | 2 | 1.80 | 4.63 | |||||
179 | 182 | 3 | 2.70 | 19.28 | 11.26 | ||||
Including | 179 | 180 | 1 | 0.90 | 54.07 | 30 | |||
192 | 193 | 1 | 0.90 | 1.15 | |||||
213 | 214 | 1 | 0.90 | 0.80 | |||||
VL-21-1157 | 13620E | 350 | -77 | 82 | 84 | 2 | 1.80 | 0.73 | |
124 | 128 | 4 | 3.60 | 0.92 | |||||
145 | 168 | 23 | 20.70 | 2.17 | |||||
Including | 167 | 168 | 1 | 0.90 | 21.86 | ||||
234 | 235 | 1 | 0.90 | 9.56 | |||||
VL-21-1158 | 14110E | 165 | -70 | 95 | 96 | 1 | 0.85 | 3.54 | |
100 | 101 | 1 | 0.85 | 2.54 | |||||
116 | 117 | 1 | 0.85 | 3.31 | |||||
134 | 138 | 4 | 3.40 | 1.55 | |||||
157 | 158 | 1 | 0.85 | 0.99 | |||||
173 | 174 | 1 | 0.85 | 8.03 | |||||
178 | 179 | 1 | 0.85 | 2.14 | |||||
181 | 182 | 1 | 0.85 | 2.13 | |||||
240 | 241 | 1 | 0.85 | 1.35 | |||||
VL-21-1159 | 14180E | 343 | -73 | 48 | 52 | 4 | 3.60 | 1.52 | |
58 | 60 | 2 | 1.80 | 0.94 | |||||
93 | 95 | 2 | 1.80 | 0.93 | |||||
107 | 108 | 1 | 0.90 | 0.70 | |||||
110 | 111 | 1 | 0.90 | 1.51 | |||||
127 | 147 | 20 | 18.00 | 1.42 | |||||
186 | 189 | 3 | 2.70 | 11.75 | 10.71 | ||||
Including | 188 | 189 | 1 | 0.90 | 33.10 | 30 | |||
194 | 196 | 2 | 1.80 | 1.97 | |||||
206 | 222 | 16 | 14.40 | 1.13 | |||||
232 | 233 | 1 | 0.90 | 1.06 | |||||
238 | 239 | 1 | 0.90 | 1.12 | |||||
259 | 262 | 3 | 2.70 | 2.16 |
Notes on the Calculation of Assay Intervals
- “Significant” assay intervals are defined as 1m core length or more of mineralization with an average fire assay result of greater than 0.7 g/t Au, representing the bottom cut-off for high-grade mill feed in the Marathon April 2021 Feasibility Study mine plan. Assay intervals with an average fire assay…
Read More:Marathon Gold Reports Latest Drill Results from Berry
2022-04-04 11:30:00